Apollo-5

Apollo | image: http://sse.jpl.nasa.gov

Country : USA
Research Org : NASA
Mission launch : 1963 - 1972
Apollo-1 : 27 January 1967 ( Tragic Loss of Three Apollo Astronauts )
Apollo-4 : Launched 9 November 1967
Apollo-5 : Launched 22 January 1968
Apollo-6 : Launched 4 April 1968
Apollo-7 : Launched 11 October 1968
Apollo-8 : Launched 21 December 1968
Apollo-9 : Launched 03 March 1969
Apollo-10 : Launched 18 May 1969
Apollo-11 : Launched 16 July 1969
Apollo-12 : Launched 14 November 1969
Apollo-13 : Launched 11 April 1970
Apollo-14 : Launched 31 January 1971
Apollo-15 : Launched 26 July 1971
Apollo-16 : Launched 16 April 1972
Apollo-17 : Launched 07 December 1972

The unmanned Saturn/Apollo 5 was the first test flight of the Lunar Module (LM). Mission objectives were to verify the ascent and descent stages, the propulsion systems, and the restart operations, and to evaluate the spacecraft structure, LM staging, 2nd stage (S-IVB) and instrument unit (Iu) orbital performance.

After launch, the S-IVB 2nd stage ignited to insert the spacecraft into a 163 x 222 km Earth orbit with a period of 88.3 minutes and an inclination of 31.63 degrees. The nose cone was jettisoned and after a coast of 43 min 52 sec the LM was separated from the LM adapter. The LM entered a 167 x 222 km orbit with a period of 88.4 min and an inclination of 31.63 degrees. A planned descent propulsion system (DPS) of 39 seconds was cut short after only 4 seconds. The burn was designed to simulate deceleration for descent to the lunar surface, but was stopped prematurely due to overly conservative programming of the flight software. An alternate flight plan was put into effect, in which the DPS fired for 26 seconds at 10% thrust and then for 7 seconds at maximum thrust. A third DPS firing was performed 32 seconds later, consisting of a 26 second burn at 10% thrust and 2 seconds at maximum thrust, followed by a burn to simulate an abort during the landing phase, in which the ascent propulsion system (APS) was ignited simultaneously with the DPS being shut down. The APS burn lasted 60 seconds, followed by a 6 min 23 sec firing which depleted APS fuel. At the end of the 11 hr, 10 min test period, both LM stages were left in orbit eventually to reenter and disintegrate. Despite the initial premature DPS shutdown, the mission was deemed a success and operation of all LM systems was confirmed.

References
http://nssdc.gsfc.nasa.gov/database/MasterCatalog?sc=1968-007A

AddThis Social Bookmark Button AddThis Feed Button
Stay tuned !
Get updated Chandrayaan and space research news. Subscribe to News Bulletin
Countdown
Chandrayaan-1 in 2008
Chandrayaan-2 in 2011
This is not an official website of ISRO
Privacy Policy | Terms of Use | Disclaimer | References | Contact us | About us | Sitemap